The reinforcement of abutment at Lijiaxia arch dam

【Author】

Weiyuan Zhou,Guanglin Du & Qiang Yang,Dept.of Hydraulic Engineering,Tsinghua University, Beijing,China

【Abstract】

<正>Due to the complex rock formations,the dam's abutments,especially the left abutment require reinforcement to enhance the dam's overload safety.The reinforcement is presented and its effect on overload safety discussed.The mechanism of reinforcement after geomechanical model test and FEM analysis is given. Both model test and numerical calculation show that the overload safety factor has increased from the original 3.0 to more than 5.0 as a result of the reinforcement.

【Keywords】

The reinforcement of abutment at Lijiaxia arch dam;test;rock;FEM;

References

To explore the background and basis of the node document

Springer Journals Database

Total: 4 articles

  • [1] Advanced rock mechanics,
  • [2] Zhou,Weiyuan, Stability analysis of Lijiaxia arch dam‘s left abutment(Research papers),
  • [3] Yu.N.Rabotnov, Creep rupture, Proc.12 intern. congr.appl.mech,
  • [4] Larsson H;Olofsson T, Bolt action in jointed rock, Proc. Int. Symp. On Rock Bolting,

Similar documents

Documents that have the similar content to the node document

More>>